Realizations

Investment: Supply and implementation of water treatment technology for the training pool at the Fisheries Academy of the Republic of Angola.
Scope of work: Installation of water treatment technology for training pool with dimensions 25mx50mx3,5m with filtration system, pressure boosting and swimming pool chemical dosing system. Execution of water intake for the needs of the Academy complex: two submersible pumps with a capacity of 40m3 with well housings, mechanical filtration system. Water pumping station with a capacity of 40m3/h for the entire Academy, emergency fire water pumping system. Water disinfection system consisting of two chloraters and UV lamps paired with the whole system. Automation system that controls the entire water supply system for the academy from the water intake.
Date of implementation: 2013 – 2016
Contract value: 3 078 700 PLN

« 1 of 2 »

Investment: Repair of water treatment plant in Ludwinów, the Cyców community
Scope of work: Replacement of the filter bed, replacement of damaged and outdated manual fittings for modern electric dampers, replacement of faulty piping components and shutoff and measuring fittings, full automation of the facility along with the visualization system to the contracting Authority’s premises.
Date of implementation: 2016
Contract value: 78 806 PLN


Investment: Reconstruction and extension of the water treatment plant in Wielgolas Duchnowski in the municipality of Halinów.
Scope of work: Technology system with a capacity of 50m3/h: two submersible pumps with well housing, aerator with airbag DN 1600, 4 x DN 2100 filtration system, pump set with a capacity of 120m3/h, UV sterilization lamp, full automation of the facility along with the visualization system to the contracting Authority’s premises, renovation of the building, reinforced concrete tank V=344m3, supply network ground objects.
Date of implementation: 2014 / 2015
Contract value: 1 817 444 PLN